
Add to Cart
Curtain Finial Pole Hardware Precision Manufacturing Cast Iron Pipe Curtain Rod
Place of Origin: China
Thickness: 0.3mm,0.35mm,0.4mm,0.45mm
NET Weight: 1.5kg/6.7m/0.3mm
MOQ: 1000 sets
Price : US$0.44~0.6/m
Lead time : 7-15 days or negotiation
Installation of curtain rods
(1) Marking: Take the support under the installation curtain as the standard marking, and mark the positioning line and hole position line of the support. For three supports, the middle support is located in the window or wall, and the ends must be equidistant. The supports at both ends are about 15-20 cm away from the wall or 5-10 cm away from the end of the Roman rod.
(2) Punching: When the curtain rod is installed, the punching depth should be between 3.5cm and 5cm, of course, it can not run out of eyes and skew phenomenon; when drilling, you must pay attention to stay away from wires and water pipes, which punch When finished, press it into the hole.
(3) Mounting rod: The support is fastened by self-tapping; the ring is inserted into the rod, the ring is divided into two, and one ring is left at each end; the Roman rod is pressed into the open support and adjusted so that the two ends The distance between the decorative head and the wall is the same.
(4) Hanging the curtain: After the curtain is put on the hook, hang one end of the hook into the hole of the ring, but after hanging the curtain, the curtain should be opened and closed to check whether the sliding is flexible. The height of the curtain.
Place of Origin | China |
Brand Name | Customized logo |
Surface treatment | Mill finish/Anodizing with sandblasted/Powder coating/Electrophoresis |
Alloy | Zinc alloy, aluminium alloy |
Thickness | 0.30mm--Customized |
Applications | Furmiture curtain poles |
Length | 6.7 Meter |
MOQ | 1000KGS |
Supply Ability | 40000/Month |
Packaging | Protective film/Craft paper/Cottom film/Carton box/Pallet |
Shipping Port | Shanghai or Qingdao Port |
Fob price | USD2000-USD2800/Ton |
Lead time | 12 working days for mold and sample delivery time. 15 working days after receiving deposit for full container |
Total Employees | 100 |
Payment term | 30% T/T in advance, the balance will be paid before shipping., Western Union or LC at sight |
Loading quantities | 20 GP loading 10 tons,40 HQ loading over 23 tons |